咨询热线
400-700-9883
装修公司 >装修施工 >墙面装饰施工工艺流程(Wall decoration construction

墙面装饰施工工艺流程(Wall decoration construction

发布时间:
责任编辑:居众装饰
装修施工

墙面装饰施工工艺流程(Walldecoration construction process) Three, wall decoration construction process Wallpaper, wall decoration construction process Technology process coveringwall decoration Stone wall decoration process Decorative wall decoration process Construction process woodenkeel partition wall Construction process glassbrick partition wall Construction process mirrorglass wall Wallpaper, wall decoration construction process wallpaper,Qiangbu papered wall。 wallstructure limepulp wallsurface smooth。

After drying, cover 107glue otheradhesive。 (two) pastedwallpaper, Qiangbu main process。 Cleaning base, fill jointsurface gypsum bonded joints, reinforcingputty,sanding paper装修公司, full Guanizi, flattening, brushing, brushing primer, moisture-proof agent, water wallpaper, wall line wallpaper, wallpaper, paint binder base paper cutting, gluing, wall mounted, lapjoint takeup pressure wipeglue, adhesive bubble dressing。 (three) pastedwallpaper, Qiangbu construction points grassrootstreatment, must clean,smooth smooth,moisture-proof coating should paintedevenly, should toothick。

plasterbase: surfacecracks, uneven puttyleveling。 Full putty,polished flat。 Determine puttypasses primarywood: wooden base should planed, burr,peak stubbles, exposednail head。 Seams, nails putty。Full putty, polished smooth。 primarygypsum board gypsum board joints used kanfengnizi processing, broughtup concrete。Surface putty。 Brushing bottomrubber generally use 107 glue, bottomrubber again survive, wallpaper,Qiangbu damp, brushing waterproofcoating。 horizontallines, wallpaper,Qiangbu Wang Ping vertical, right。

plasticwallpaper water, glue expand,so waterrun paper, plastic wallpaper fully expanded, glass fiber base wallpaper, Qiangbu, water without expansion, paper。Composite paper wallpaper textilefiber wallpaper should afterpaste, press wallpaper adhesive, can leavebubbles, squeeze glueshould promptlywiped。 (four) matters needing attention metopemoisture content should lessthan 8%。 surfaceroughness reached meters,foot check, differencebetween Pinfengfirst time design,after lowerpattern match。 Shenyangcorner seam, Shenyang Kok wallpaper wraparound 20mm mountedglass fiber nonwovencloth cloth, backcan't brush adhesive adhesivebrush grass-rootslevel。

Because Qiangbu smallhole,printedthrough plasticscar装修墙面得施工工序, affect appearance。Technology process coveringwall decoration woodpaneling, wood paneling Structure woodpaneling, wood dado。 anticorrosivewood bricks, woodenframe panelnail glued skeletoncrib。 Wooden keel section 20~40mm 40~50mm, wooden keel spacing 400~600mm。 woodpaneling,wood dado construction process: line装修墙面得施工工序,making wall, wooden frame, wooden frame fixed installation woodveneer, closing line installation constructionpoints metoperequirement wallsurface within10 millimeters, plasteringmethod can morethan 10 millimeters, woodblock between keelcan panelheight bonenail sticks, whole splitinstallation, installation skirting board woodendado skirting board woodenwallboard, skirting board height 150 mm, woodstrips fixed woodenkeel according panelthickness, transverse keel generally about400 mm, verticalkeel usually600 millimeters。

When panelthickness morethan horizontalkeel spacing can enlargedappropriately。 toppanel cableleveling, wood strip size should woodendado after installation, should immediatelyfinishes, brushing oil again, preventother types surfacepollution。 mattersneeding attention Wet walls should dryafter construction, moisture-prooftreatment。 One can do moistureproof layer lowerleft panels; three wallbrick overhangs, woodenkeel certaindistance from wall,avoid panel。Two walls Yangcorner, you must add nailed wooden keel。

brushingvarnish, should choose sametree species, color panel。Stone wall decoration process naturalgranite, marble wall construction constructiontechnology; Natural granite, marble plate, wall structure: Natural stone ensuresafety, generaluse doubleinsurance approach, copperwire binding, cementmortar。 structuralwalls cmapart about20 cm perfusedafter consolidation。 naturalgranite, marble panels, wall construction technology: Primary treatment, installation steelmesh plate, base plate, hole drilling, filling, sealing, binding polishing。

(two) constructionprocess greenslate wall; constructionprocess greenslate surface can similarmethod glazedtiles。 Green stone water absorption high,before usewater soak。 Family decoration smallspecifications localstone artificialstone can refer glazedtile paste method。 Decorative wall decoration process basictechnological process veneeringdecoration; adheredglazed tile: basiccleaning treatment, wipelarge grey brick brick row, soaking, wire, paste, paste tile, standard, clean, clean seam jointing。

stickingceramic mosaic bricks: Clean base,wipe off basedust, remove bricks,play lines,paste paper,remove constructionpoints When dealing grassroots,all kinds wallshould dayearlier。 concretewalls shall convexpart, cuttinghair, clean floating ash。 use107 plastic cement mortar facades。 When becomesdry, brickshells carriedout。 standardpoints must pastedbefore formalpaste pastedsurface。 gaugeshould anytime unevenfeet removed。Ceramic tiles must morethan two hours before pasting。 bricksshould takenout driedwhen bubbling。

When sticking, wholebrick sleeve lampswitch supportingparts toiletequipment。 After setting up, use cotton silk whitecement paste。 mattersneeding attention basemust dust,dust。 oldwall should originalmortar。 tilesmust driedafter immersion。 Because dryingplate paving mortar, water awayfrom plate,resulting cementmortar dehydration, influence coagulation,problems hollowing,shell。 Construction process woodenkeel partition wall woodenkeel partition wall construction procedures Clean line,find basicrules, cementmortar do pillow ground(also known "shellline, skirting) back ceilingline main structure, vertical frame wall reinforcement, installed along, along verticalpartition, vertical keel, corrugated transverse keel, sealing nail coverpanel, reinforcingpad reserved socket position, wood cover panel processing。

woodenkeel partition wall construction points woodenskeleton should whitepine use specifications 40mm 70mm。 distancebetween verticalkeel generallybetween 450~600 millimeters。 When installing along toptimber wall, wallshall brickwall leastl20 millimeters, partitionwall originalstructural wall firmlyconnected。 Construction process glassbrick partition wall Construction points glassbrick partition wall: Glass bricks shall reinforcingbars twoF6 F8bars。 foundationshall greaterthan 150mm, widthshall morethan 20mm glassbrick。

Metal sections shall glasspartition walls, openingshall greaterthan 10 brickthickness。 When partitionlength morethan 1500mm, verticaldirection twolayer steel(when morethan 1500mm, set two bar); horizontaldirection every three vertical joints steelbar。 reinforcingbar extends lessthan 35mm。 glassbricks reinforced reinforcementshall exceed4m。 Glass partition wall bothends metalsection wings should have lessthan 4mm slidingjoints, joints glassfelt filling; partitionplate ventralprofile should have lessthan 10mm expansionjoint, so glassbrick。

topbrick glassbrick should metalprofile 25mm,so glassbrick can brokendue rigidextrusion。 jointbetween glassbricks shall lessthan 10mm greaterthan 30mm。 glassbrick sectionbar, section bar elasticsealant。 Construction process mirrorglass wall mirrorglass wall construction。 Method fixingglass: glass,fixing woodframe liningboard chromeplated screws copperscrews。 pressglass hardwood装修设计,plastic, metal othermaterials。 glassonto liningboard epoxyresin。 mirrorglass installation process: Clean grass,wood, nail nail, skeleton lining board fixed glass。 mattersneeding attention: surfaceglass should strictlyprohibited when installing。




居众装饰,始于1996年,专注于新房装修,旧房改造、设计施工等领域,具有国家建设部颁发的设计甲级,施工壹级的资质。(需要设计装修的业主,可以留下您的联系方式报名,装修顾问将会贴心联系您。)

免责声明:本站部分内容信息系作者结合法律法规、互联网相关知识整合。如若侵权请通过投诉通道提交信息,我们将按照规定及时处理。【投诉通道】